AIA Progress Billing

Bill big jobs in draws. Keep retainage and deposits straight.

Switch any estimate to AIA G702/G703 progress draws. Enter each line's percent complete and BD Project Tools holds back retainage, credits the deposit, charges sales tax on what you billed, blocks over-billing, and builds the pay application your GC or owner expects. Change orders grow the contract on the same job.

Read the step-by-step how-to guide →

The Real Problem

The Job Is Big. The Pay App Lives in a Spreadsheet.

You land a $120,000 job. The GC wants a pay application every month, holds back 10% retainage, and you already collected a $12,000 deposit when the contract was signed. Now somebody has to keep all of that straight until the job is done.

Usually that's a spreadsheet on the owner's laptop: percent complete per line, what was billed last time, how much retainage is sitting with the GC, whether the deposit came off the first draw. Then the owner adds a change order halfway through and the whole schedule shifts.

One wrong cell and you either short yourself or over-bill. Short yourself and that money is gone. Over-bill and the pay app comes back for corrections while your check waits.

BD Project Tools bills the draws from the estimate you already built, so the math and the paperwork come from the same numbers.

$12,000
Retainage held on a $120,000 job at 10%
Money you earned but won't collect until the final draw. The progress billing panel shows retainage held on every contract, so it doesn't get forgotten.

Five Steps From Signed Estimate to Final Draw

Draws are an office tool, set up on a computer or tablet. Your crew keeps logging time, receipts, and photos from their phones.

1

Switch the Estimate to Draws

On the estimate's Invoice & Bill tab, set Billing Mode to AIA G702/G703 progress draws and enter a Retainage %. It's a per-estimate choice, so smaller jobs keep billing on a single invoice.

2

Bill Draw #1

Click Convert & Bill Draw #1. For each line on the schedule of values, enter the % complete to date or the this period $ amount, and see the scheduled value, previously billed, and balance beside it. Moving a whole group at once? Tick the lines, enter one percent or dollar figure, and preview the change before you confirm it.

3

Check It, Then Send the Pay App

Before a draw goes out, pre-send checks flag problems, like a draft that's out of step with the contract or a line that jumped further than your warning threshold. Send it and your customer gets the pay application PDF: an Application and Certificate for Payment page plus a Continuation Sheet with every line. The figures are certified when it's sent, and the app keeps the exact PDF you emailed.

4

Bill the Next Draw

Click + Bill Next Draw each billing period. Retainage is withheld on every draw, and the deposit you collected at approval is credited against the draws. Approve a change order and its lines join the schedule of values, so later draws can bill them.

5

Final Draw and Close-out

Mark the last draw Final and all the retainage held on the contract is released on it. Once the job is fully billed, Close-out checks that nothing is still open (a balance to finish, retainage still held, a payment mid-processing, an unapproved change order) and then records what happened to any leftover deposit, with an audit trail.

A $120,000 Job, Billed in Three Draws

10% retainage and a $12,000 deposit collected when the customer signed. Non-taxable lines, to keep the math easy to follow.

Draw Work This Period Retainage Withheld Deposit Credit Retainage Released Net Due
Draw #125% complete $30,000 −$3,000 −$12,000 $0 $15,000
Draw #260% complete $42,000 −$4,200 $0 $0 $37,800
Draw #3 (Final)100% complete $48,000 −$4,800 $0 +$12,000 $55,200
Totals $120,000 −$12,000 −$12,000 +$12,000 $108,000
Swipe the table sideways to see every column.
It ties out to the contract. The $12,000 deposit plus $108,000 in draws is $120,000, exactly. The deposit came off Draw #1 because that draw owed more than the deposit; on a smaller first draw, the rest would carry to the next one.
Retainage comes back on the final draw. The $7,200 withheld on Draws #1 and #2 sat on the panel as retainage held. Marking Draw #3 Final released it along with Draw #3's own $4,800. With taxable lines, each draw also gets its own sales tax line on the dollars billed that period; retainage never shrinks the taxable amount.

Extra Work That Bills With the Contract

Owners add work mid-job. A change order keeps it tied to the original estimate, so it gets billed instead of slipping through the cracks.

Linked to the Parent

Click + Change Order on an accepted or in-progress estimate. You get a new estimate with a banner linking back to its parent, and it rolls up under that job instead of cluttering your estimate list.

Inherits the Details

The change order starts with the parent's job, customer, contact details, business unit, and sales tax jurisdiction already filled in. You add the new line items.

Its Own Approval and Deposit

Send it for online approval like any estimate. Your customer sees it's a change order before they sign, and you can require a separate deposit on it.

Grows the Schedule of Values

On an AIA contract, approving the change order adds its lines to the schedule of values. Until then they show on the draw as Not billable until approved. The pay app lists each change order and the net change to the contract sum.

Deductions Too

A change order can take work out as well as add it. If a deduction leaves a draw owing less than zero, that draw becomes a credit, and the credit is applied to the next draw and printed on its pay app.

Single-Invoice Jobs, Too

Not billing in draws? Click Bill Change Order and it gets its own invoice under the parent job. See the change order guide.

Example: after Draw #1 on the $120,000 job, the owner adds $8,500 of work. Once that change order is approved, the next pay application reads:
Original contract sum$120,000.00
Net change by change orders$8,500.00
Contract sum to date$128,500.00

See It in the App

Top or left: the Progress Billing panel on a demo contract with 10% retainage. Bottom or right: a change order, with a banner linking it to its parent estimate. Click either screenshot to enlarge.

Everything the Pay App Needs

All of it comes with invoicing, which is on by default for every company.

Billing Mode Per Estimate

Pick single invoice or AIA progress draws on each estimate. Small jobs stay simple.

Retainage, Held and Released

Withheld on every draw at your percentage (adjustable per line) and released in full on the draw you mark Final.

Deposit Credited

A deposit collected at approval is credited against the draws, so the deposit plus the draws equal the contract.

Sales Tax Per Draw

Each draw charges tax only on the taxable dollars billed that period, on its own tax line that updates as you edit.

Over-Billing Blocked

No line can bill past its scheduled value, and the contract can't bill past its total.

Pay Application PDF

An Application and Certificate for Payment page and a Continuation Sheet, emailed with the draw. The sent copy is stored exactly as it went out.

Pre-Send Checks

Problems are flagged before a draw leaves the office, not after the GC sends it back.

Credit Draws

When a deductive change order turns a draw into a credit, the credit carries to the next draw instead of getting lost.

Guarded Close-out

Won't close a contract with money still open, and records leftover deposit with an audit trail. It never moves money or issues a refund on its own.

A Payment Link on Every Draw

With Stripe connected, each draw has its own card or ACH payment link, and the payment lands on that draw.

Progress at a Glance

The panel shows billed to date against the contract, percent complete, retainage held, balance to finish, and every draw's status.

One Draw, One Invoice

Every draw is its own invoice with its own number, due date, and books record.

How Draws Reach QuickBooks

You push each draw when it's ready; it doesn't sync on its own. Open the draw and click Send to Connected Books. It goes to QuickBooks Online as its own invoice, with the work billed, retainage withheld, deposit credit, and sales tax on separate lines, so the QuickBooks total matches the draw's net due.

Card and ACH payments taken through Stripe follow the Stripe-to-QuickBooks payment sync setting you chose in Settings.

AIA Billing Isn't Rare. AIA Next to Real Job Costing Is.

JobTread and Knowify both offer AIA-style pay applications, and they do it well. If a pay app is all you need, you have good options. What's different here is what sits beside the draws, in one platform, on every plan.

Three Cost Tracks

Materials, Labor, and Subs stay separate on every estimate, invoice, dashboard tile, and Variance tab, so a sub-heavy job's margin isn't buried in "Other Costs."

Cost Pools

Buy concrete or drywall mud once and spread the cost across the jobs that actually used it. None of the competitors we compare offers this. How Cost Pools work →

The CFO Dashboard

The job you bill in draws is the same job your receipts, crew hours, and subcontractor costs post to, and the same job the CFO Dashboard reports on. See the CFO Dashboard →

Every Plan, No Gating

AIA draws, change orders, Cost Pools, and the CFO Dashboard come with every plan. You pay by team size, not by feature.

Built for Contractors Who Bill in Stages

Subs Billing a GC

The GC wants a G702/G703-style pay app every period and holds retainage until the end. Send it from the job instead of rebuilding a spreadsheet each month.

GCs and Remodelers on Big Jobs

Bill an owner as the work progresses on a large remodel or build, with the deposit credited and every change order on the record.

Owners Who Need the Big Picture

See billed to date, percent complete, retainage held, and balance to finish on every contract without asking the office.

Office Managers and Bookkeepers

Each draw is its own invoice with retainage and deposit on separate lines, so what you push to QuickBooks matches the pay app.

AIA Progress Billing FAQ

The questions owners and bookkeepers ask before they bill their first draw.

Is the pay application the official AIA form?
It follows the G702/G703 layout: an Application and Certificate for Payment page with the contract totals, retainage, change orders, and current payment due, plus a Continuation Sheet with every schedule-of-values line. It's BD Project Tools' own document, not the licensed AIA Contract Document. If your contract requires that specific form, confirm with the GC or owner.
Do draws sync to QuickBooks automatically?
No. Each draw is its own invoice, and you push it when it's ready by clicking Send to Connected Books on that draw. It reaches QuickBooks Online with the work billed, retainage withheld, deposit credit, and sales tax on separate lines, so the QuickBooks total matches the draw's net due. Card and ACH payments taken through Stripe follow the Stripe-to-QuickBooks payment sync setting you chose in Settings.
How is the customer's deposit handled?
A deposit collected when the customer approved the estimate is credited against the draws in order, each draw taking up to what it still owes, so the deposit plus all the draws equal the contract. Credit already applied to a paid draw never changes.
When is retainage released?
When you mark a draw as the Final draw. The final draw releases all retainage held on the earlier draws plus its own. Until then, the progress billing panel shows retainage held on the contract.
Can a draw bill more than a line is worth?
No. Over-billing is blocked. No line can bill past its scheduled value, and the contract can't bill past its total.
How do change orders affect the draws?
A change order on an AIA contract is billed with the contract. Its lines show on the draw as Not billable until approved; once it's approved they join the schedule of values and later draws can bill them. The pay app lists each change order and the net change to the contract sum. A change order can also deduct work, and a draw left owing less than zero becomes a credit that's applied to the next draw.
Can I bill a regular estimate in stages without AIA draws?
No. A standard invoice created from an estimate bills every line in full. To bill an estimate in stages, set its Billing Mode to AIA G702/G703 progress draws.
Does AIA progress billing cost extra?
No. AIA progress draws and change orders are part of invoicing, which is included on every Best Decision Project Tools plan with no feature gating.

Send the Pay App From the Job, Not a Spreadsheet

AIA progress draws and change orders are included with every Best Decision Project Tools subscription. No add-on, no premium tier. Set up your first draw from an estimate you've already built.

USA 250 Early Adopter Rate: 25% off your base plan through December 31, 2026. Full platform on every plan, plans from $99 $74.25/mo. Your USA 250 rate is locked for your subscription as long as your account stays active and in good standing.