HomeTools
TimekeeperReceipt CaptureSchedulerJob PhotosField EstimatingProject ManagementCFO DashboardChat & Job HubMeeting NotesCustomer PortalDocument VaultFeaturesCost PoolsSegment PerformanceCommunication TemplatesAIA Progress BillingJurisdiction ReportingTrades & Workers' CompJob SpecsPrice Books
Pricing
Project Tools PricingWith Bookkeeping
Compare
vs Jobbervs Housecall Provs ServiceTitanvs FieldPulsevs Contractor Foremanvs JobTread
How It WorksAboutLearn Get Started
Job Specs

Measure the room once. Let the estimate do the math.

Job Specs turns what your crew measures on site into estimate quantities. Build a spec sheet once, let the crew fill it on a phone, and the estimate suggests each line's quantity with your waste factor and rounding already applied. Then watch your margin and markup move as you price.

The Real Problem

The Tape Measure Numbers Never Make It to the Estimate Intact

Your crew lead measures the living room: 14 by 18. That number goes on a notepad, a text message, or the back of a receipt. Then somebody in the office re-types it, multiplies it, remembers (or forgets) the waste, and rounds it.

Every hand-off is a chance to miss. Forget 10% waste on 252 square feet of flooring and you're 26 square feet short, which means a second supply run and labor you didn't price. Use last month's numbers instead of this job's, and the bid is wrong before the customer reads it.

Job Specs gives the measurement one path. The crew answers the same questions on every job, the spec does the multiplication, and the estimate offers the quantity, waste and rounding included. Nobody re-types it.

252 → 278
Square feet measured vs. square feet to order on a 14 × 18 room with 10% waste, rounded up
Waste % and rounding are set once on the estimate template line, not remembered on every bid

Five Steps. From Tape Measure to Priced Estimate.

Templates are set up once in the office on a computer or tablet. Crews fill specs on a phone. Templates live under Setup > Job Specs.

1

Build a Spec Sheet Template

Add sections and questions, then drag them into the order your crew walks a job. Question types are Short answer, Number, Long answer, Dropdown, Yes / No, and Calculated. A Calculated question does the math for you: multiply, add, subtract, divide, or round up other answers, like Length × Width for floor area.

2

Build an Estimate Template

Pick the products and services from your catalog that a typical job of this kind uses, and drag them into order. On each line, set a default quantity, a unit, a Waste %, and Rounding (round up). Then choose Suggest the quantity from this spec answer to tie the line to a question, like Floor area.

3

The Crew Fills the Spec on Site

From a phone, a crew member with estimate access picks the job and the spec template, answers the questions, and measures the space: a room, a flat area, a linear run, or a piece of work. Live measurements, a 2D sketch, and a 3D-look view update as they type. Work in progress is kept as a draft on the device while they go.

4

Apply the Template, Then Accept the Quantities

On the estimate, click Apply Template to drop in the catalog lines. Once the job's spec is complete, the estimate shows a button for each mapped line, like Use 278 SF. You click it; nothing changes on its own. Fill Blank Attribution can also copy the spec's lead source, sales rep, estimator, and Project Manager fields onto the estimate.

5

Price It and Watch the Margin

As you set prices and costs on the Estimate Builder, every line rolls into its cost bucket (Materials, Labor, or Subs) and the Margin and Markup boxes recalculate right next to the total. If you've set your overhead and income target, each box shows your target and turns green when you hit it. With price books and rate cards loaded, the estimate can price lines from the costs in effect on the date you choose.

Step 1: a spec sheet template with Number questions, units, required flags, and Calculated questions.
Step 2: estimate template lines that take their quantity from a spec answer, with waste % and round-up.
Step 3: the crew fills the spec on a phone.

Four Ways to Measure a Space

The crew picks the shape that matches the work. Each one asks only for the measurements it needs.

Room

Length × Width × Ceiling height

Gives floor, ceiling, and four wall surfaces, plus perimeter and volume. Assign doors and windows to the wall they sit in, and subtract cut-outs like islands or closets.

Area

Length × Width, or direct SF

For flat outdoor areas like a patio or a lawn bed. Add rectangles for L-shaped or connected areas, subtract cut-outs, and record an optional depth.

Linear Run

Run length (ft)

Fence, gutter, pipe, or edging. Optional diameter and depth of bury for underground runs.

Piece / Work Order

Your spec questions

For work that isn't measured in feet: fixtures, units, service calls. The details come from the questions on your spec template.

A 14 × 18 Room With an 8 ft Ceiling

What the live measurements show after the crew adds one 3 × 7 ft door to a long wall.

252SF
Floor area (14 × 18)
2,016CF
Volume (14 × 18 × 8)
491SF
Wall area: 512 SF of walls minus the 21 SF door
64ft
Perimeter

Need to split a wall, like tile on the bottom and paint above? Add a zone for the tile and the remainder stays visible for the paint. The math refuses to hide mistakes: if the doors, cut-outs, or zones add up to more than the surface, the crew sees an error instead of a quietly trimmed number.

What's Included

Job Specs is part of the full platform on every plan. If you don't use it, switch the module off in Settings and your team won't see it.

Office

Spec Sheet Templates

Drag-and-drop sections and questions, required questions, dropdown choices, units, and Calculated questions. Editing a template your crews already used saves a new version, so past specs keep the version they were filled on.

Office

Estimate Templates

Reusable sets of catalog lines with default quantities, units, waste %, and round-up. Each line can take its quantity from a spec answer. Prices and costs come from your Products & Services catalog.

Field

Phone Spec Capture

Crews with estimate access fill specs and measure rooms, areas, linear runs, and pieces from a phone browser, with live totals, a 2D sketch, and a 3D-look view.

Office

Job Specs Tab on the Estimate

Start a job spec from a template right from the estimate, and see every spec already captured for that job in one list.

Office

Suggested Quantities You Approve

A completed spec puts a Use button on each mapped estimate line, with waste and rounding applied. You decide which ones to accept.

Office

Live Margin and Markup

Margin and markup on the Estimate Builder update as you price, with Materials, Labor, and Subs tracked as three separate cost buckets.

Before the Customer Sees It

See Your Margin Change as You Price Each Line

Every line on the Estimate Builder is tagged Product, Service, or Sub. Quantity times cost rolls into Materials, Labor, or Subs, and the Margin and Markup boxes sit right beside the subtotal and total.

Margin is profit divided by price. Markup is profit divided by cost. Same dollars, two views. Sales tax is taken out first, because it isn't yours.

Your targets come from the same overhead rate the CFO Dashboard uses (monthly overhead × 12, divided by your annual revenue figure) plus your income target. With $12,500 a month of overhead on $600,000 of revenue, that's a 25% overhead rate. Add a 15% income target and you need a 40% margin, which is a 66.7% markup. A box turns green at or above target, amber within 5 points, and red below that.

Estimate Builder: Living Room Flooring
LinePriceCost
LVP flooring
278 SF × $4.50
Materials
$1,251.00 $667.20
Install labor
252 SF × $3.00
Labor
$756.00 $378.00
Floor leveling
1 × $400.00
Subs
$400.00 $300.00
Total $2,407.00 $1,345.20
Margin
44.1%
Target: 40%
Markup
78.9%
Target: 66.7%

Example numbers, no sales tax. The flooring quantity (278 SF) came from the spec with 10% waste and round-up; the install line uses the same 252 SF floor area with no waste.

Below target: a 21.8% margin against a 30% target, so both boxes turn red.
On target: a 30.5% margin and 43.9% markup clear their targets, so both boxes turn green.
The Estimate Builder: each line is tagged Product, Service, or Sub, so its cost lands in the right bucket. Click any screenshot to enlarge it.

Who It's For

Any trade where the bid starts with a tape measure.

Flooring, Paint, Drywall, Tile

Rooms with floors, walls, and ceilings, doors and windows taken out, and a zone where the wall changes material.

Landscape, Hardscape, Fence

Flat areas with L-shaped add-ons and an optional depth, plus linear runs for fence, edging, and drainage pipe with depth of bury.

Owners Who Bid Through Others

When a crew lead or estimator does the walk-through, the spec makes sure the same questions get answered every time and the office prices from the real numbers.

Job Specs FAQ

What owners and estimators ask before they build their first spec sheet.

Do my crews need a computer to fill out a job spec?
No. A crew member with estimate access fills the spec and measures spaces from a phone browser. The office builds the spec sheet templates and estimate templates, which works best on a computer or tablet.
Does a completed spec change my estimate on its own?
No. When a spec is complete, the estimate shows a button for each mapped line, such as Use 278 SF. Nothing changes until someone in the office clicks it.
What can a crew measure on site?
Four kinds of spaces: a Room (length, width, and ceiling height), a flat outdoor Area, a Linear run such as fence, gutter, pipe, or edging, and a Piece or work order for non-spatial work. Rooms can subtract doors, windows, and cut-outs, and Areas can add rectangles for L-shaped layouts.
Do space measurements fill in estimate quantities?
Through the spec, with your review. You tie estimate template lines to spec answers, such as a Calculated floor area, and the Measured Specs and Current Prices panel on the estimate previews each line's quantity before you accept it.
What happens if I edit a template my crews have already used?
Editing a spec sheet template that already has captured specs saves a new version. Specs your crews already filled stay tied to the version they were captured on.
Where do the margin and markup targets come from?
From the same overhead rate the CFO Dashboard uses (monthly overhead × 12, divided by your annual revenue figure) plus your income target. A 25% overhead rate and a 15% income target make a 40% margin target, which works out to a 66.7% markup target.

Bid From the Measurements, Not From Memory

Job Specs is included with every Best Decision Project Tools subscription. No add-on, no premium tier. Build one spec sheet for your most common job and use it on the next walk-through.

Read the step-by-step estimating guide →

USA 250 Early Adopter Rate: 25% off your base plan through December 31, 2026. Full platform on every plan, plans from $99 $74.25/mo. Your USA 250 rate is locked for your subscription as long as your account stays active and in good standing.